# Asset Box Management

TE supports packing assets of existing projects into asset boxes. An asset box can be opened in new projects and are ready to use in new projects, significantly saving the time needed to build basic assets in new projects. It is recommended for scenarios of newly created projects such as series projects with similar data tracking plans, migration of test projects to official ones and new projects caused by app launching in new area.

Find Asset Box from Project Management - Asset Box. The feature can only be used by project Owner or Root.

# Check TE versions in advance

Asset boxes can be applied when the source project and the destination project are using the same TE version. Please check in advance, and you can schedule system updates if the two versions are different.

# Create an asset box

Creating an asset box includes the process of combing through and packing the assets of the current project to form an asset box. Assets that can be packed include dashboards, metrics, all other cohorts except result cohorts, tags, data tables, user entities and meta data (including custom properties and dimension properties) created by any member.

# Select assets and auto-associate

You can view and select all project assets that need to be put into an asset box in separate classes. Most assets in TE have dependents. For example, dashboards depend on reports, which in turn depend on metrics. To ensure assets in asset box are immediately usable after unboxed, the assets depended upon by the assets you select will also be automatically added to the asset box. For example, after selecting custom property, you will also pack the events and properties depending upon the custom property into the box.

Please note that 'hidden' events and properties cannot be selected in the assets list. Instead, they can only be packed if they are used in other selected assets. When unpacked, the hidden assets will remain hidden in the new project.

# Select dimension properties

In event or user property, you can view its dimension properties by filtering the property of the "HAVE" dimension. By default, the dimension table property will be added to the asset box after selecting the original property. After selecting the property, you can enter the editing state from the action bar and then select whether to retain the association relationship between property and dimension table in the asset box. If you cancel the association relationship with dimension table, then the dimension table property will not be included in the asset box.

# Select custom events and properties

Filter custom events and properties in event and property types, and then tick the results to seal them in the box.

# Submit assets

After submitting, you need to name the asset box and verify whether selected assets contain elements that cannot be sealed.

# Isolated properties

As event properties cannot exist without depending on events, properties that have not been bound to any event cannot be sealed in the box. Therefore, the association of these properties must be manually specified to ensure the asset box is readily usable upon unboxing.

# Confirm asset box content

View the number of assets sealed by class and download the asset box to local computer after confirmation. The asset box file cannot be locally unpacked and can only be used for purpose of unboxing and sealing in TE products.

# Unpack

After creating a new project, you can use the asset box to build assets in one key. After data ingestion, you can start analysis of the new project using these assets.

# Upload asset box

Select the asset box file generated by box sealing, and unboxing will start upon loading. After parsing, you can view all data assets within the box.

Please note that when the multi-timezone switch or exchange rate data source of the source project of the asset box is not consistent with that of the current project, assets will not be correctly generated and thus unboxing will not be supported. In this case, you can retry to unbox after adjusting the configuration of the current project.

# Conflicts strategy

When the project is not empty, conflicts may arise during unpacking. Common conflicts include strict-verification failure and inconsistent data types. Currently, only "discarding assets from asset box" can be used as a strategy to ensure existing assets of the project are not affected. Assets whose dependents have become unavailable assets will also be discarded.

A maximum of 80 conflicts are allowed. To avoid excessive conflicts, please unpack only in newly created projects.

# Asset Owner

Set an asset owner as the owner of all assets generated by the asset box and the member will be responsible for distributing the assets to other project members. An asset owner must be a member of the current project. Please be cautious in selecting the owner, because you will not be able to modify the asset owner once the assets have been unpacked.

# Generate meta data and assets

After confirming the meta data and assets to be generated, the system will immediately start the generation process as per the list, which may take a long time and cannot be interrupted. During this process, you can still conduct analysis and query within the project. However, please avoid modifying existing assets in case more conflicts or prolonged unboxing time are caused. As you wait, you can leave the unpack page. We will send a notification to you after the unpack is completed and provide details about all assets and metadata generated.

# Unpack remarks

Assets may become unavailable after unapcked for the following reasons:

  1. Cohorts or tags may become not usable. The ID files for ID cohorts and ID tags are expected to be different in the original project and in the new project. You may upload the ID files to refresh the cohorts and tags, in order to use them in the new project. Result cohorts are not usable because results are not transferable among projects. You may edit the reports that are already using the resulst cohorts by replacing the results cohorts with other valid cohorts.
  2. SQL replacement may fail. TE will attempt to run the SQL assets in the new project by replacing the project ID in SQL statements. However, replacement may fail due to high complexity of your SQL statements. In these cases, you may manually modify your SQL statements after unpack.
  3. Data tables may be empty. In the Beta version, asset boxes from another cluster do not carry any concrete data in data tables. Though the table structures are intact, which means the Dimension Properties associated with the data tables can still be used in reports, you may find the reports to yield no results. You can upload the files manually to fill the data tables and dimension properties will be updated.

You can find the suggested next steps in the 'Unpack Remark' section on Asset Details page.