目录
此内容是否有帮助?

# Warning Management

# I.The Significance of Warning Management

To give project managers the ability of warning and monitoring for key data, the main functions are as follows:

  1. Timely polling of real-time data. For the key indicators exceeding the standard, SMS or email warning can be carried out in the first time so as to shorten the response time and improve the control over the product.
  2. Create early warning by editing formulas, such as ratios, to increase flexibility in creating indicators;
  3. Warning by grouping, and different grouping items of the same index are warned by different warning trigger standards;
  4. Warning based on the comparison with forecast value can provide more intelligent and fast insight into abnormal data.

# II. Location and Applicable Role of Warning Management

# 2.1 Function Position

The location of early warning related functions can be operated through the following two entrances:

  1. [Data Management-Warning Management]

Warning tasks in projects can be managed comprehensively.

  1. [Behavioral Analysis-Event Analysis]

Warning tasks can be quickly created for relevant indicators in daily analysis.

# 2.2 Applicable Roles

Corporate Supervisor
Administrator
Analyst
Ordinary member
View the list of warning management




Add, edit and delete self-built warning tasks




Edit and delete other people's warning tasks




Permission description:

● Role must have

▲ The role has the permission by default, but can revoke

△ The role is not available by default, but can be authorized

○ Role must not have

# III. Operate Methods of Early Warning Management

# 3.1 Warning Management Page

# 3.1.1 Warning Task Configuration

Administrators and above roles can open the configuration task pop-up window through 'Create Waring' in the 'Warning Management' page

# 3.1.2 Limitation of Warning Missions

You can configure up to 50 tasks in a project. When there are more than 50 tasks, you cannot save.

# 3.1.3 Warning Delay Configuration

When calculating the warning, the transmission delay is considered. Reserved buffer period, buffer period can be set in the project configuration

The default is 120 minutes for day level and 20 minutes for hour level. The input box is limited to integers from 1 to 999.

# 3.2 Warning Configuration Page

# 3.2.1 Basic Information

Warning Name

You can enter up to 24 characters and cannot duplicate names.

Warning Indicators

You can choose a certain analysis angle of an event as an warning monitoring object.

Edit Formula

Warning of indicators that require formula editing to create.

Group Item

Demand scenarios grouped by different events/user attributes address the same event indicators.

# 3.2.2 Warning Rules

Calculation period

You can select either 'by hour' or 'by day' as the criterion, which is associated with the trigger rule in the alarm rule.

Warning period

Select the time to time by hour, and the day of the week by day; the 'warning period' is applicable to the entire 'warning task'.

Warning rules

Group value

When selecting a group value, you can set different warning trigger conditions for the batch group value.

Trigger rule

The trigger rules based on 'comparison method', 'calculation period' and 'compare with whom" are as follows:

Compare with whom
Comparison method
Calculation period
Compare with whom (type)
What can compare
Fixed value
High/low
-
Fixed value
Value
Last day
High/low
By day
Period value
Value/percentage
Same time last week
High/low
By day
Period value
Value/percentage
7-Day average
High/low
By day
Period value
Value/percentage
Last hour
High/low
By hour
Period value
Value/percentage
Same time yesterday
High/low
By hour
Period value
Value/percentage
24-Hour average
High/low
By hour
Period value
Value/percentage
Predicted value
High
By hour/by day
Forecast upper limit
-
Predicted value
Low
By hour/by day
Forecast lower limit
-

Predicted value

In the case of no need to master the specific business indicators, you can judge whether to trigger a warning based on the predicted value:

  • When the indicator is above the upper limit of the predicted value
  • When the indicator is below the lower limit of the predicted value

The algorithm of the prediction model adopts the Hannan-Rissanen algorithm, and the algorithm paper can refer to the doc (opens new window).

# 3.2.3 Notification Method

You can configure the members to be added in SMS and email separately

# 3.3 Warning Details Page

# 3.3.1 Warning Task Setting

This part will be substituted into the settings of the warning task. Expansion can be folded and cannot be edited by default.

# 3.3.2 Display screening area

Time checkbox style

The time checkbox is the same as in event analysis.

Data recording range

For tasks by day, record data for the past year (up to 366 points), and display data for the past year when selected.

For hourly tasks, record data for nearly one year (up to 36,624 points) and display data for up to one month (3124 points) when selecting. When the time frame is selected for more than 31 days, only the results of the last 31 days of the frame will be displayed.

Predicted value legend

  • Indicator actual value y (dark blue solid line in the figure)
  • Prediction curve yhat (light blue dotted line in the figure)
  • Prediction interval yhat_upper-yhat_lower (light blue area in the figure)
  • Abnormal indicator point display (red dot in the figure)

Download data

  1. If the difference is negative, put a negative sign on it.
  2. Different rules correspond to warning under different group conditions.
  3. The warning situation is indicated by either "normal" or 'abnormal'.

# 3.3.3 Form Details Area

  1. Time: Running time of warning task, in order of time in table
  2. Warning Rules: Rules for the left-hand warning task setting area
  3. Warning situation: Normal or abnormal; If the prompt 'too few samples of forecast value' indicates that the data point is less than 10 and no forecast value calculation has been carried out.